Quantum Forum V

Quantum Forum for DXi V5000

Boom barrier installation manual

 

 

BOOM BARRIER INSTALLATION MANUAL >> DOWNLOAD LINK

 


BOOM BARRIER INSTALLATION MANUAL >> READ ONLINE

 

 

 

 

 

 

 

 











 

 

some of the advanced features offered by the sector controller are: interactive graphical user interface via a backlit lcd display to facilitate and simplify the installation process fully automated single button limit setup independent memory input, non-memory input, barrier raise and barrier lower inputs advanced closed-loop speed control to … Automatic gates with an access control system have many applications and functions to choose from. The parking boom barrier security gates, for example, are built to withstand: • a large number of entrances • Only one door at a time • A security system for the hospital is a block system. As well as other features such as an electronic door lock Local: (281) 441-2002 Toll Free: (844) 444-8144 Texas Boom Company | Oil Spill Containment Booms. Gallery; News; About Us; Contact Catalogues and Brochures (69) Corporate Library (8) Barriers. Nice - Instruction Manuals: Automation for gates and road barriers / Barriers. K3. IT EN FR ES DE PL NL | pdf, 1.26 MB. Nice - Addendum: Automation for gates and road barriers / Barriers. M BAR-L BAR. EN FR | pdf, 178.91 KB. Boom Installation Procedure 1) Take out booms. 2) Apply glue to the protrusion side of the convex boom and insert the protrusion side into the concave boom to bond the two booms to become one boom, as shown in Figure 2-4A. 3) Wipe off spilled glue with cloth, as shown in Figure 2-4B. The cables should be protected during barrier enclosure installation. Barrier enclosure shall be fixed to the foundation by the means of anchor bolts delivered along with the equipment. Barrier arm shall be installed as per the entry requirement; it shall be 3 meter for car entrance and 4 meter (Maximum) for Truck entry. FAAC Documents: technical and user manuals for the installation of FAAC products. Discover the FAAC wide range. opening barrier. 4. Wait for the complete setting of the concrete. 5. Unscrew the 4 nuts that hold the base joined to the anchoring brackets and position the rack on the plate (Fig. 4). 6. Attach the bar to the barrier body. ATTENTION: never move the barrier rod for any reason until it horizontal, and do not perform the emergency or manual ma- Use the links to locate Service Manuals, Maintenance Manuals, Service and Repair Manuals, Parts Manuals and Operator's P12-2 Remove and Inspect Boom Cables. E. 3/2017. All Sections. Add SX-125 XC. Add Z-45 XC CE/AS Models. E1. 3/2017. Programmed. Remove 10 year cable inspection. F. 6/2017. - If a car enters in the loop's range whenclosing, the barrier immediately reverses - If a car enters in the loop's range whenopening, the barrier keeps opening Note: If the automatic closing function is on, the barrier automatically closes after a pause time. The pause time can be set from 1 to 120 seconds. Transmitter Receiver(NC) The barrier is either controlled by a person in manual operating modes or by access control systems in automatic operating modes and monitored by induction loops and/or safety light barriers. Electrical energy is used exclusively for operating the barrier. The barrier boom weight is balanced out by spring energy. • The Boom Gate limit switch, motor and control unit are already connected up. • Only the photocell, the loop detector and the supply voltage have to be connected up in installation. 7 Transmitter 2 To control the barrier remotely 8 Stud 4 9 Screw Nut (M10) 8 10 Flat Gasket 8 11 Spring Washer 6 12 Clamp 2 To fix the cabinet an

Comment

You need to be a member of Quantum Forum V to add comments!

Join Quantum Forum V

Tips + Tricks

© 2024   Created by Quantum Forum V.   Powered by

Badges  |  Report an Issue  |  Terms of Service